2009 |
Design, bid and construction of the beam line started |
2010 |
Construction of the beam line |
J-PARC driver output to increase gradually |
Design of large-scale high-temperature high-pressure equipment |
2011 |
Construction and experiment of large-scale high-temperature high-pressure equipment will start |
2012 |
J-PARC output will achieve 1MW |
High-temperature high-pressure experiments |
2013 |
Summary of Research |